Overview
SMS provides a complete framework for proactive safety management in aviation operations, from initial safety reports through risk mitigation and follow-up.Key Features
Safety Reporting
Voluntary and obligatory safety reports with public submission portal
Hazard Identification
Systematic hazard analysis with risk evaluation and prioritization
Risk Management
Risk assessment matrix with pre and post-mitigation tracking
Mitigation Planning
Action plans with assigned responsibilities and follow-up controls
Safety Reporting System
Report Types
- Voluntary Reports
- Obligatory Reports
Employee-initiated safety reports for proactive hazard identification:Confidential Reporting: Reporter information is optional to encourage reporting.
Public Reporting Portal
SMS includes a public-facing portal for safety report submission:- Accessible without authentication
- Submit voluntary reports from any device
- Submit obligatory incident reports
- View safety bulletins
- Take safety surveys
Public URL pattern:
/acceso_publico/[company]/sms/crear_reporteThis encourages reporting from all personnel, including contractors and visitors.Hazard Identification & Risk Analysis
Hazard Identification Process
Hazard Identification Structure
Risk Analysis Matrix
Risk is assessed using Probability × Severity: Probability Levels:| Level | Description | Likelihood |
|---|---|---|
| 5 - Frequent | Occurs regularly | > 1/100 |
| 4 - Occasional | Occurs sometimes | 1/100 to 1/1,000 |
| 3 - Remote | Unlikely but possible | 1/1,000 to 1/10,000 |
| 2 - Improbable | Very unlikely | 1/10,000 to 1/100,000 |
| 1 - Extremely Improbable | Almost impossible | < 1/100,000 |
| Level | Description | Impact |
|---|---|---|
| A - Catastrophic | Multiple fatalities, aircraft destroyed | |
| B - Hazardous | Serious injury, major damage | |
| C - Major | Injury, significant damage | |
| D - Minor | Minor injury, minor damage | |
| E - Negligible | No injury, minimal damage |
Risk Acceptance Criteria
Risk Tolerance Levels
Risk Tolerance Levels
Based on the risk matrix result:
- Intolerable (Red): Requires immediate mitigation (5A, 5B, 4A)
- Undesirable (Yellow): Requires mitigation plan (4B, 3A, 5C)
- Acceptable (Green): May be accepted with monitoring (1D, 1E, 2E)
Mitigation Planning
Mitigation Plan Structure
Mitigation Measures
Each plan contains specific actions:Follow-Up Controls
Verify mitigation effectiveness:Example Mitigation Plan
Example Mitigation Plan
Hazard: Foreign object debris (FOD) on apronMitigation Plan:
- Responsible: Safety Manager
- Start: 2024-01-15
- Daily FOD Walks
- Responsible: Ramp Supervisor
- Supervisor: Safety Manager
- Estimated: 2024-01-20
- Follow-up: Weekly FOD walk logs review
- Install FOD Containers
- Responsible: Facilities Manager
- Supervisor: Safety Manager
- Estimated: 2024-02-01
- Follow-up: Container usage inspection
- Staff Training
- Responsible: Training Manager
- Supervisor: Safety Manager
- Estimated: 2024-01-30
- Follow-up: Training completion records
Safety Promotion
SMS Activities
Plan and track safety promotion activities:Attendance Management
Track employee participation:- Link employees to activities
- Record attendance status
- Generate attendance reports
- Track training completion
Safety Training Integration
Links to course management:- Initial SMS training
- Recurrent training
- Training expiration tracking
- Course completion status
Safety Bulletins
Publish safety communications:Safety Surveys
Create and distribute safety surveys:SMS Statistics & Reporting
Dashboard Metrics
-
Report Statistics:
- Total reports (voluntary + obligatory)
- Open vs. closed reports
- Reports by area
- Report trends by month
-
Risk Statistics:
- Hazards by risk level (pre-mitigation)
- Hazards by risk level (post-mitigation)
- Risk reduction effectiveness
- Hazards by type
-
Activity Statistics:
- Planned vs. completed activities
- Attendance rates
- Training completion
Analytics & Trends
SMS Analytics Features
SMS Analytics Features
- Reports by Area: Bar chart showing which operational areas generate most reports
- Risk by Type: Pie chart of hazard classifications
- Monthly Trends: Line graph of report volume over time
- Pre vs. Post Risk: Compare risk levels before and after mitigation
- Source Analysis: Reports by source type (proactive/reactive/predictive)
- Mitigation Progress: Track open vs. closed mitigation plans
User Workflows
For All Personnel
-
Submit Safety Report:
- Use public portal or internal system
- Describe observed hazard or incident
- Provide details and supporting evidence
- Submit (optional: provide contact info)
-
Participate in Safety Activities:
- Attend safety meetings
- Complete safety training
- Respond to safety surveys
For Safety Staff
-
Process Reports:
- Review submitted safety reports
- Create hazard identifications
- Conduct risk analysis
- Determine if mitigation required
-
Manage Mitigation:
- Create mitigation plans for high-risk hazards
- Assign mitigation measures to responsible parties
- Track implementation progress
- Verify effectiveness through follow-up controls
-
Safety Promotion:
- Plan and schedule SMS activities
- Publish safety bulletins
- Create and distribute surveys
- Analyze safety trends
Regulatory Compliance
ICAO SMS Framework Alignment:The module supports the four pillars of SMS:
- Safety Policy: Document safety objectives and promotion activities
- Safety Risk Management: Hazard identification and risk analysis
- Safety Assurance: Monitoring through follow-up controls and metrics
- Safety Promotion: Training, bulletins, surveys, and activities
Integration with Operations
Planning Integration
Safety reports can reference specific aircraft, work orders, or flight operations
Training Integration
SMS training requirements link to course management and employee records
Incident Response
Obligatory reports trigger investigation and mitigation workflows
Continuous Improvement
Analytics identify trends for proactive safety improvements
